Projects

The project involved enhancing the water well system to comply with NJDEP regulations and meet demand requirements. This included adding a new well with a multi-stage vertical turbine pump, discharge piping, blow-off valve, and meter. Existing wells #3 and #4...

B360 takes pride in its multi-layered role in the Nepal Task Order, offering a comprehensive suite of services to ensure its success. As a provider of quality assurance, architectural, engineering, and construction oversight services, B360 brings together a diverse range of...

B360 is actively engaged in the Mali/Anka Jiko project, prioritizing meticulous quality assurance throughout its lifecycle. Emphasizing design review, construction oversight, and vigilant monitoring of construction activities, B360 ensures adherence to stringent quality...

B360 has rehabilitated the George Washington Carver Museum, a 14,528 ft2 one-story (with basement) brick building located in the Tuskegee Institute campus National Historic Landmark District. It was originally constructed to serve as the campus laundry between 1914 and 1916...

Drag View

 

$122M

Worth of projects we have handled globally.